Baseline Monitoring: A survey should be conducted on basic environmental parameters in the area
surrounding the proposed project before construction begins. Subsequent monitoring can assess thechanges in those parameters over time against the baseline.
Impact Monitoring: The biophysical and socio-economical (including public health) parameters