If, on the other hand, the lot is 30 percent defective, a sample size of 6 (curve E) will accept the lot only
42 percent of the time, whereas a sample size of 21 (curve J) will accept such a lot only 8 percent of the
time and a sample size of 84 (curve M) will always fail such a lot