If the batch of same items has been rejected more than 2 times, a Quality Deficiency Report (QDR), QAD-022 shall be issued to the sub-contractor (incoming) or the person doing the job (in-process) for correction and corrective action.QA Engineer shall follow up with the QDR and verify the corrective action.