Dear all
The attached files are the operation condition log
at the BCS2 today, October 1, 2015. I attached also that the panel of
power consumption on Sep.1 and Sep. 30, 2015.
For your information, the power consumption from September 1 to September 31
was 66,571kw/h. The power consumption of August was 67,015kw/h.
The average of power consumption are almost same as last month.
For the Frozen compressor, I adjust the CO2 operation pressure a bit
to lower the room temperature a little bit.
Please refer the photo of operation hours panel. At the point of September 27,
longest running compressors are two stage compressor for frozen line,
around 3800hrs. The standard operation hours for overhauling of GEA compressor
is at 12,000 hours to 15,000 hours. In this case, we do not have to open for 1 to 1.5
years more, but we will monitor the situation by and by. I met K. Miyoshi, the owner
of BANGKOK COLD STORAGE last month with K. Kaneo. At that time, K. Miyoshi
said he is very much satisfied their facility and our service.
This is the efforts and helps from everybody, installation team, maintenance team
and the management. I thank you again to all of you.
Regards
YODA