These are the steps taken during the design phase of the equipment life cycle to ensure that reliability requirements have been properly allocated and that a process for continuous improvement exists.
The FMEA technique is applied on an automatic plastic welding machine used for the production of blood bags in a life care manufacturing company in south India.
The preventions suggested in this paper can considerably decrease the loss of production hours in the industry due to the
breakdown of the machine.