Obviously the below two Dnote refer to two different SW; SW D19B for D-sample and SW D310 for SOP.
But, from PgP1, we are not able to tell what kind of improvement has been done between these two SW unless those SW failure related to production testing.
And, I saw some communication already go to the SW designer which should be the correct approach.