After we paid the payment. We can get the certification document of the old machinery factory. Documents that are detailed as follows:
1.Specification of Boiler (Old Factory)
2. Document specific information of the cyclone. Signed by the environmental engineer.
3. Cyclone specification document. Shelling and Preclean with signed environmental engineer certification.
Documents we received was accurate documentation according to the Department of Industry.