This cost was set by teams derived from almost every functional area of the firm, including product design, engineering, purchasing, production engineering,manufacturing, and parts supply. Although the allowable cost was usually lower than the current cost, sometimes the allowable cost was higher because the new product specifications demanded higher performance and functionality than existing designs.