Section 4.4 has been modified to require that the Subcontractor recycle, reuse, remove or dispose of materials as required by the Contract Documents and as necessary to achieve the Sustainable Objective. These changes have been made so that A401–2007 SP is consistent with changes made in A201–2007 SP.