Do all inspection characteristics ( SC-criteria) for the product / process exist, are they documented at the working plan
(100% ckecks), the drawing as well as the inspection plan for the series?
Are the following documents available, do they have the current level and are they released: maintenance plans, work instructions,
test specifications (PVs), control plans, packaging