11) HEADERS ARE NOT REQUIRED ON THE APPLICATION OF ONLY ONE LAYER CABINET. TWO 3/4” MPT CONNECTIONS ARE PROVIDED FOR THE WASH WATER SUPPLY LINE IN LIEU OF HEADERS.
12) T CONNECTORS SHOULD BE REQURIED TO PROVIDE WITH A CONNECTION POINT FOR A PRESSURE GAUGE.
13) INJECT DETERGENT LINE INTO MAIN WATER LINE AS CLOSE AS POSSIBLE AND UPSTREADM FROM THE T-SERIES.
14) PROTECT ALL WASH WATER AND PLUMBING COMPONENTS THAT ARE SUBJECT TO FREEZING