In terms of accuracy, standard data times are based on average times for a given task. Therefore, these times will vary from those times generated from a single stop watch analysis. The deviation between standard data time and time derivable from an individual analysis should not exceed the accuracy limits set for the system. Normally, regression analysis determines these limits and level of accuracy by developing a mathematical model between time and the relative variables, with an R-squared value of .80 or higher.