Please follow below steps to run the system measurement and let me know if you have any query:
1. Please check attached Measurement Plan, a list of all relevant production and develop systems. If any of the systems is Java or Portal system, please let me know and no need to measure;
2. For each relevant system, please run t-code: USMM, and follow attached “short Guide for System Measurement” step by step;
3. After running USMM in each system, please choose one system as the central system (SAP Basis 7.02 or 7.40), and run t-code: SLAW2, following attached LAW2 Brief Guide to consolidate all the reports.