he problem of die placement has been occurred 2 cases (see attached) within 2 weeks, this is most unacceptable. Curious to know the problem is caused from the same root cause or not !
We need the full 8D report with clearly define the concreted actions by coming Wed, Sep-07.
- All Baltic lots are in WIP before W/B must be done 100% inspection to essure there is no problem on die placement.
- While the lots are not yet start-in will be on-hold until we recevie the full 8D report in Sep-07.