TRNSYS was used to set hot water heating energy demand and
electric energy demand as the entire demand of the primary energy
based on the predicted and actually measured demand of heating and cooling energy. Then, equipment system design process for
reduction of the aforementioned energy was utilized to configure
and combine the optimally designed equipment system as shown
in Table 5. One unit of the TR (230 USRT) and two units of the HP in
different capacities (16 and 25 hp) were selected for cooling supply. And two units of the GB in different capacities (151 and 186kW)
and two units of the HP in the same capacity (25 hp) were selected
for heating supply. One unit of the AR (100 USRT) was selected for
the purpose of cooling and heating supply. For hot water heating supply, one unit of the GB (58 kW) and two units of the HP (16 and
10 hp) in different capacities were selected. For electric supply, one
unit of the PV (500 m2) was used without any CGS selected.