- Manage land clearance and topsoil removal properly in accordance to 'Mine Plan' to minimize exposed areas as much as practicable.
- Pile the waste/overburden dumping as per the designed slope with drainage system available to minimizes erosion.
- Pile the overburden dumping at least 50 m away from any watercourse, and in existing cleared areas,