Please send us drawings of ejector pipe first.
We need to check the accurate size of ejector pipe because we have to make our suction box fit with this ejector pipe.
After checking it, we need to ask the dryer maker to provide us the custom-made suction box.
Moreover, if “High temperature balance” is required for 130 degree-dried masterbatch,
please also give us its details about the following so that we can know its structure and installation with our dryer.
- overview of each parts,
- installation (=how to connect each parts)
Considering the lead time, it’s quite tight schedule.
So, we do hope your soonest reply.