we detect a reduction of the contribution of waiting to the total variable operation time consisting of waiting and driving periods (Tab.7).
Independently from the (un) loading duration o and independently from the value of max the contribution of travel activity increase if the allowed make span length is reduced because the total travel time remains more or less unchanged but the waiting time sum is reduced now.