Fig. 7. The nature of plans produced by Graphplan on a blocks world problem with varying number of robots.
As more resources are added, the plan length and number of steps in the plan reduce because there are more
possibilities of avoiding resource bottlenecks and so, more ways of generating a parallel plan.