We checked container vanning in last Friday. The 20ft container was arranged with ETA TTH 10-Oct (ETA Lat Krabang 7-Oct).
In case of below two conditions , our forwarder fix using rope in the container like as attached as countermeasure against damage problem.
*There is 2steps at last line against container door side.
*There is 500mm over space between container door and last line.
Here attached is showed vanning plan and photo. Sheet 20ft(1st) is direct shipment to TTH and sheet 20ft(2nd) is de-vanning at Lat Krabang because of two consignee (TTH and Okaya Thailand).
Please inform the result when open the container at TTH.