All surface water run-off from the construction site including offices, worker accommodation and other temporary installations shall be controlled. This shall be controlled and separated from sewerage, canteen and other contaminated waste water. This shall be accomplished through the installation of temporary cut-off perimeter drains to collect and contain surface water prior to disposal and discharge into nearby system