One problem of building was that the location of the north bank of Bea การแปล - One problem of building was that the location of the north bank of Bea ไทย วิธีการพูด

One problem of building was that th

One problem of building was that the location of the north bank of Bear Run was not large enough to provide a foundation for a typically built Wright house.[9]

The Kaufmanns planned to entertain large groups of people, so the house would need to be larger than the plot allowed. Also, Mr. and Mrs. Kaufmann requested separate bedrooms as well as a bedroom for their adult son and an additional guest room.[9]

A cantilevered structure was used to address this.[9] The structural design for Fallingwater was undertaken by Wright in association with staff engineers Mendel Glickman and William Wesley Peters, who had been responsible for the columns featured in Wright’s revolutionary design for the Johnson Wax Headquarters.

Preliminary plans were issued to Kaufmann for approval on October 15, 1935,[13] after which Wright made a further visit to the site and provided a cost estimate for the job. In December 1935, an old rock quarry was reopened to the west of the site to provide the stones needed for the house’s walls. Wright only made periodic visits during construction, instead assigning his apprentice Robert Mosher as his permanent on-site representative.[13] The final working drawings were issued by Wright in March 1936 with work beginning on the bridge and main house in April 1936.


The strong horizontal and vertical lines are a distinctive feature of Fallingwater
The construction was plagued by conflicts between Wright, Kaufmann, and the construction contractor. Uncomfortable with what he saw as Wright's insufficient experience using reinforced concrete, Kaufmann had the architect's daring cantilever design reviewed by a firm of consulting engineers. Upon receiving their report, Wright took offense and immediately requested Kaufmann to return his drawings and indicated he was withdrawing from the project. Kaufmann relented to Wright's gambit and the engineer’s report was subsequently buried within a stone wall of the house.[13]

After a visit to the site in June 1936, Wright rejected the stonemasonry of the bridge, which had to be rebuilt.[citation needed]

For the cantilevered floors, Wright and his team used upside down T-shaped beams integrated into a monolithic concrete slab which both formed the ceiling of the space below and provided resistance against compression. The contractor, Walter Hall, also an engineer, produced independent computations and argued for increasing the reinforcing steel in the first floor’s slab. Wright refused the suggestion. While some sources state that it was the contractor who quietly doubled the amount of reinforcement,[14] according to others,[13] it was at Kaufmann’s request that his consulting engineers redrew Wright’s reinforcing drawings and doubled the amount of steel specified by Wright.

In addition, the contractor did not build in a slight upward incline in the formwork for the cantilever to compensate for the settling and deflection of the cantilever. Once the concrete formwork was removed, the cantilever developed a noticeable sag. Upon learning of the steel addition without his approval, Wright recalled Mosher.[15]

With Kaufmann’s approval, the consulting engineers arranged for the contractor to install a supporting wall under the main supporting beam for the west terrace. When Wright discovered it on a site visit, he had Mosher discreetly remove the top course of stones. When Kaufmann later confessed to what had been done, Wright showed him what Mosher had done and pointed out that the cantilever had held up for the past month under test loads without the wall’s support.[16]

In October 1937, the main house was completed.
0/5000
จาก: -
เป็น: -
ผลลัพธ์ (ไทย) 1: [สำเนา]
คัดลอก!
One problem of building was that the location of the north bank of Bear Run was not large enough to provide a foundation for a typically built Wright house.[9]The Kaufmanns planned to entertain large groups of people, so the house would need to be larger than the plot allowed. Also, Mr. and Mrs. Kaufmann requested separate bedrooms as well as a bedroom for their adult son and an additional guest room.[9]A cantilevered structure was used to address this.[9] The structural design for Fallingwater was undertaken by Wright in association with staff engineers Mendel Glickman and William Wesley Peters, who had been responsible for the columns featured in Wright’s revolutionary design for the Johnson Wax Headquarters.Preliminary plans were issued to Kaufmann for approval on October 15, 1935,[13] after which Wright made a further visit to the site and provided a cost estimate for the job. In December 1935, an old rock quarry was reopened to the west of the site to provide the stones needed for the house’s walls. Wright only made periodic visits during construction, instead assigning his apprentice Robert Mosher as his permanent on-site representative.[13] The final working drawings were issued by Wright in March 1936 with work beginning on the bridge and main house in April 1936.The strong horizontal and vertical lines are a distinctive feature of FallingwaterThe construction was plagued by conflicts between Wright, Kaufmann, and the construction contractor. Uncomfortable with what he saw as Wright's insufficient experience using reinforced concrete, Kaufmann had the architect's daring cantilever design reviewed by a firm of consulting engineers. Upon receiving their report, Wright took offense and immediately requested Kaufmann to return his drawings and indicated he was withdrawing from the project. Kaufmann relented to Wright's gambit and the engineer’s report was subsequently buried within a stone wall of the house.[13]After a visit to the site in June 1936, Wright rejected the stonemasonry of the bridge, which had to be rebuilt.[citation needed]For the cantilevered floors, Wright and his team used upside down T-shaped beams integrated into a monolithic concrete slab which both formed the ceiling of the space below and provided resistance against compression. The contractor, Walter Hall, also an engineer, produced independent computations and argued for increasing the reinforcing steel in the first floor’s slab. Wright refused the suggestion. While some sources state that it was the contractor who quietly doubled the amount of reinforcement,[14] according to others,[13] it was at Kaufmann’s request that his consulting engineers redrew Wright’s reinforcing drawings and doubled the amount of steel specified by Wright.In addition, the contractor did not build in a slight upward incline in the formwork for the cantilever to compensate for the settling and deflection of the cantilever. Once the concrete formwork was removed, the cantilever developed a noticeable sag. Upon learning of the steel addition without his approval, Wright recalled Mosher.[15]With Kaufmann’s approval, the consulting engineers arranged for the contractor to install a supporting wall under the main supporting beam for the west terrace. When Wright discovered it on a site visit, he had Mosher discreetly remove the top course of stones. When Kaufmann later confessed to what had been done, Wright showed him what Mosher had done and pointed out that the cantilever had held up for the past month under test loads without the wall’s support.[16]In October 1937, the main house was completed.
การแปล กรุณารอสักครู่..
ผลลัพธ์ (ไทย) 2:[สำเนา]
คัดลอก!
ปัญหาหนึ่งของอาคารเป็นที่ตั้งของธนาคารทางตอนเหนือของหมีเรียกใช้ก็ไม่มากพอที่จะให้รากฐานสำหรับบ้านไรท์ที่สร้างขึ้นโดยปกติจะเป็น. [9] Kaufmanns วางแผนที่จะสร้างความบันเทิงให้กลุ่มใหญ่ของคนดังนั้นบ้านจะต้อง มีขนาดใหญ่กว่าพล็อตที่ได้รับอนุญาต นอกจากนี้นายและนาง Kaufmann ขอห้องนอนแยกต่างหากเช่นเดียวกับห้องนอนสำหรับลูกชายของผู้ใหญ่ของพวกเขาและห้องพักเพิ่มเติม. [9] โครงสร้างแพร่งถูกใช้ในการอยู่นี้. [9] การออกแบบโครงสร้าง Fallingwater ได้ดำเนินการโดยไรท์ ร่วมกับเจ้าหน้าที่วิศวกรของเมนเดล Glickman และวิลเลียมเวสลีย์ปีเตอร์สซึ่งเป็นผู้รับผิดชอบสำหรับคอลัมน์ที่โดดเด่นในการออกแบบที่ปฏิวัติไรท์สำหรับจอห์นสันแว็กซ์ที่สำนักงานใหญ่. แผนเบื้องต้นที่ออกให้แก่ Kaufmann เพื่อขออนุมัติวันที่ 15 ตุลาคม 1935 [13] หลังจากที่ไรท์ ทำไปต่อไปยังเว็บไซต์และให้ประมาณการค่าใช้จ่ายสำหรับงาน ในเดือนธันวาคมปี 1935 เหมืองหินเก่า ๆ ได้ถูกเปิดไปทางทิศตะวันตกของเว็บไซต์เพื่อให้หินที่จำเป็นสำหรับผนังของบ้าน เพียงไรท์ได้เข้าชมเป็นระยะ ๆ ในระหว่างการก่อสร้างแทนการกำหนดฝึกงานโรเบิร์ตเชอร์เป็นผู้แทนถาวรของเขาในสถานที่. [13] ภาพวาดที่ทำงานสุดท้ายที่ออกโดยไรท์มีนาคม 1936 เริ่มต้นด้วยการทำงานบนสะพานและบ้านหลังใหญ่ในเดือนเมษายน 1936 เส้นแนวนอนและแนวตั้งที่แข็งแกร่งเป็นคุณลักษณะที่โดดเด่นของ Fallingwater การก่อสร้างถูกรบกวนด้วยความขัดแย้งระหว่างไรท์ Kaufmann และผู้รับเหมาการก่อสร้าง ไม่สบายใจกับสิ่งที่เขาเห็นว่าเป็นประสบการณ์ที่ไม่เพียงพอของไรท์ใช้คอนกรีตเสริมเหล็ก Kaufmann ได้ออกแบบเท้าแขนกล้าหาญของสถาปนิกตรวจสอบโดย บริษัท วิศวกรที่ปรึกษา เมื่อได้รับรายงานของพวกเขาไรท์ขอเอาความผิดและทันที Kaufmann จะกลับภาพวาดของเขาและบอกว่าเขาได้รับการถอนตัวจากโครงการ Kaufmann ยอมอ่อนข้อให้กับกลเม็ดไรท์และรายงานของวิศวกรถูกฝังอยู่ต่อมาภายในกำแพงหินของบ้าน. [13] หลังจากที่ไปเยือนสถานที่นั้นในเดือนมิถุนายน 1936 ไรท์ปฏิเสธ stonemasonry ของสะพานซึ่งจะต้องมีการสร้างขึ้นมาใหม่. [อ้างจำเป็น ] สำหรับชั้นแพร่ง, ไรท์และทีมงานของเขาใช้คว่ำคาน T-รูปแบบบูรณาการเป็นพื้นคอนกรีตเสาหินซึ่งทั้งสองเกิดขึ้นเพดานของพื้นที่ด้านล่างและให้ความต้านทานต่อการบีบอัด ผู้รับเหมาวอลเตอร์ฮอลล์ยังเป็นวิศวกรผลิตคำนวณเป็นอิสระและเป็นที่ถกเถียงกันสำหรับการเพิ่มเหล็กเสริมในพื้นชั้นแรกของ ไรท์ปฏิเสธข้อเสนอแนะ ในขณะที่บางแหล่งข่าวระบุว่ามันเป็นผู้รับเหมาที่เงียบ ๆ สองเท่าปริมาณของการเสริมแรงที่ [14] ตามที่คนอื่น ๆ [13] มันเป็นตามคำขอ Kaufmann ที่วิศวกรที่ปรึกษาของเขาวาดรูปวาดเสริมไรท์และสองเท่าปริมาณของเหล็กที่ระบุโดยไรท์นอกจากนี้ผู้รับเหมาไม่ได้สร้างในแนวโน้มที่ปรับตัวสูงขึ้นเล็กน้อยในแบบหล่อสำหรับคานเพื่อชดเชยการตกตะกอนและการแอ่นตัวของคาน เมื่อแบบหล่อคอนกรีตถูกลบออกคานพัฒนาลดลงอย่างเห็นได้ชัด จากการศึกษาของเหล็กนอกจากนี้โดยการอนุมัติของเขาจำได้ว่าไรท์เชอร์. [15] ด้วยความเห็นชอบของ Kaufmann วิศวกรให้คำปรึกษาจัดให้ผู้รับเหมาในการติดตั้งผนังสนับสนุนภายใต้คานสนับสนุนหลักสำหรับระเบียงทางทิศตะวันตก เมื่อไรท์ค้นพบมันในการเข้าชมเว็บไซต์ของเขามีเชอร์สุขุมเอาหลักสูตรที่ด้านบนของก้อนหิน เมื่อ Kaufmann ต่อมาสารภาพกับสิ่งที่ได้รับการดำเนินการไรท์แสดงให้เขาเห็นว่าสิ่งที่ได้ทำเชอร์และชี้ให้เห็นว่าเท้าแขนได้จัดขึ้นในเดือนที่ผ่านมาภายใต้แรงทดสอบโดยการสนับสนุนของผนัง. [16] ในเดือนตุลาคมปี 1937 บ้านหลังใหญ่เสร็จสมบูรณ์ .



















การแปล กรุณารอสักครู่..
ผลลัพธ์ (ไทย) 3:[สำเนา]
คัดลอก!
ปัญหาหนึ่งของอาคารที่เป็นที่ตั้งของธนาคารทางเหนือของหมีวิ่งไม่มากพอที่จะให้รากฐานสำหรับมักจะถูกสร้างขึ้น ไรท์บ้าน [ 9 ]

kaufmanns วางแผนเพื่อความบันเทิงของกลุ่มใหญ่ของผู้คน ดังนั้น บ้านจะต้องมีขนาดใหญ่กว่าแปลงที่ได้รับอนุญาต นอกจากนี้ นายและนางที่สุดขอแยกห้องนอนเป็นห้องนอนสำหรับลูกผู้ใหญ่ของพวกเขาและห้องพักเพิ่มเติม . [ 9 ]

โครงสร้าง cantilevered ใช้ที่อยู่นี้ . [ 9 ] การออกแบบโครงสร้างวัฒนธรรมเคลต์ดําเนินการโดย ไรท์ ร่วมกับ เจ้าหน้าที่วิศวกร เมนเดล กลิกแมน และ วิลเลี่ยม เวสลีย์ ปีเตอร์ที่ได้รับการรับผิดชอบสำหรับคอลัมน์เด่นในไรท์ของการปฏิวัติการออกแบบสำหรับจอห์นสันขี้ผึ้งสำนักงานใหญ่

เบื้องต้นแผนออกให้ที่สุดเพื่อขออนุมัติในวันที่ 15 ตุลาคม 2478 [ 13 ] หลังจากที่ไรท์ได้เยี่ยมชมเพิ่มเติมที่เว็บไซต์และให้ประมาณการค่าใช้จ่ายสำหรับงาน ในเดือนธันวาคมปี 1935 ,เป็นเหมืองหินเก่า เปิดไปทางทิศตะวันตกของเว็บไซต์เพื่อให้หินเป็นผนังของบ้าน ไรท์ให้ชมเป็นระยะ ๆในระหว่างการก่อสร้างแทนให้ศิษย์ของเขา โรเบิร์ต โมเชอร์ เป็นตัวแทนในโรงแรมถาวรของเขา [ 13 ] สุดท้ายทำงานวาดออกโดยไรท์มีนาคม 2479 กับงานเริ่มต้นบนสะพาน และหลัก บ้านในเดือนเมษายน ค.ศ.


แข็งแรงเส้นแนวนอนแนวตั้งและมีคุณลักษณะที่โดดเด่นของวัฒนธรรมเคลต์
ก่อสร้างเกิดจากความขัดแย้งระหว่าง ไรท์ คอฟแมน และการก่อสร้างของผู้รับเหมา อึดอัดกับสิ่งที่เขาเห็นเป็นคอนกรีตเสริม ไรท์ยังไม่เพียงพอ ประสบการณ์ ใช้ ที่สุด มีสถาปนิกออกแบบกล้าหาญสะพานตรวจทาน โดย บริษัท วิศวกรที่ปรึกษาเมื่อได้รับรายงานไรท์เอาความผิดและทันทีที่ร้องขอ คอฟแมนกลับภาพวาดของเขาและพบเขาถอนตัวจากโครงการ ที่สุดยอมที่จะไรท์กลเม็ดและรายงานของวิศวกรและฝังภายในผนังหินของบ้าน [ 13 ]

หลังจากการเยี่ยมชมเว็บไซต์ในเดือนมิถุนายน 2479 ไรท์ปฏิเสธ stonemasonry ของสะพานซึ่งถูกสร้างใหม่
การแปล กรุณารอสักครู่..
 
ภาษาอื่น ๆ
การสนับสนุนเครื่องมือแปลภาษา: กรีก, กันนาดา, กาลิเชียน, คลิงออน, คอร์สิกา, คาซัค, คาตาลัน, คินยารวันดา, คีร์กิซ, คุชราต, จอร์เจีย, จีน, จีนดั้งเดิม, ชวา, ชิเชวา, ซามัว, ซีบัวโน, ซุนดา, ซูลู, ญี่ปุ่น, ดัตช์, ตรวจหาภาษา, ตุรกี, ทมิฬ, ทาจิก, ทาทาร์, นอร์เวย์, บอสเนีย, บัลแกเรีย, บาสก์, ปัญจาป, ฝรั่งเศส, พาชตู, ฟริเชียน, ฟินแลนด์, ฟิลิปปินส์, ภาษาอินโดนีเซี, มองโกเลีย, มัลทีส, มาซีโดเนีย, มาราฐี, มาลากาซี, มาลายาลัม, มาเลย์, ม้ง, ยิดดิช, ยูเครน, รัสเซีย, ละติน, ลักเซมเบิร์ก, ลัตเวีย, ลาว, ลิทัวเนีย, สวาฮิลี, สวีเดน, สิงหล, สินธี, สเปน, สโลวัก, สโลวีเนีย, อังกฤษ, อัมฮาริก, อาร์เซอร์ไบจัน, อาร์เมเนีย, อาหรับ, อิกโบ, อิตาลี, อุยกูร์, อุสเบกิสถาน, อูรดู, ฮังการี, ฮัวซา, ฮาวาย, ฮินดี, ฮีบรู, เกลิกสกอต, เกาหลี, เขมร, เคิร์ด, เช็ก, เซอร์เบียน, เซโซโท, เดนมาร์ก, เตลูกู, เติร์กเมน, เนปาล, เบงกอล, เบลารุส, เปอร์เซีย, เมารี, เมียนมา (พม่า), เยอรมัน, เวลส์, เวียดนาม, เอสเปอแรนโต, เอสโทเนีย, เฮติครีโอล, แอฟริกา, แอลเบเนีย, โคซา, โครเอเชีย, โชนา, โซมาลี, โปรตุเกส, โปแลนด์, โยรูบา, โรมาเนีย, โอเดีย (โอริยา), ไทย, ไอซ์แลนด์, ไอร์แลนด์, การแปลภาษา.

Copyright ©2025 I Love Translation. All reserved.

E-mail: