Because we have plans to add new equipment with existing cable routing diagram. So we need to lock site for connect them together.
Relocate the equipment Sector B,C on to the pole
Because we have plans to Relocate the equipment Sector B,C on to the pole 6m. So we need to lock site for connect them together
Replace the Antenna Sector B