Once the "running gear" is integrated within the frame, the body is constructed as a secondary process. First, the floor pan is positioned properly, then the left and right quarter panels are positioned and welded to floor structure. This step is followed by adding the front/rear door pillars, the body side panels, rear deck, hood and roof. The entire process is typically executed by robotic machines.