There is a disturbing story. For the delivery Side rail 4654058/type 59/60/61, I.
1. interference Job holders in plastic bags that are bought to be welded.
2. do not disturb. L and R side work together in the same letter, because they take difficult to count-search (moved frequently as Roy) and loss of work time.
3. interference Installation Work order, direct the work and meet the real and signposted and clearly count.
4. a Transfer made in the Distip system, disturbing, Yes.
If there are no signs telling ORA1 and mix with left and right came in a single letter. We will request permission to send the file back! ***