1. Checked balance2.Checked parallel with the beam3.took the vane , opened valve maximum moved jockey weight get l1 and closed hole and timer read specific condition after the changed to l2 l3 l4 calculated by equation and repeated again the step3.4.after finish l4 changed the other vane and repeated step2 and step3.