Hi Khun Trevor,
I do think that TH issued the drawings for 110m3 CVPs of AKG project by modifying the drawings from 150m3 CVP template.
Could you please coordinate with TH to re-verifying the correctness of the transmitted drawings.
The project CVP will be 110m3 – 10 cells
In the batch of document (transmittal no. 52-564-29-08-2014), several contradictions were found.
On drawing no. H05-1147-01-13 – the typical flow diagram shows 12 cells instead of 10 cells