Week 18 I and the staff did not do much, because last week was to install pumps Clooney Stallings c is no 23 to lift the pump installed, then go to the track after lifting head for Thomas insert. The head gear track stirring the pot, remove all the dismantled to repair dolls and worm until then to meeting training all week about the Proficiency Examination students who intern at the sugar factory. Wiang all week, I was asked to finish the report as it Spur.