1.12 to prepare the pipeline map data and customer (GIS) follow the format that PWA designed as update and can be linked the data with PWA.
1.13 to prepare hydraulic model and update
1.14 to make the application to link with the billing system, NRW system and DMA for calculate NRW in each DMA