Two types of projects are considered here: (1) projects that involve studies outside the
existing corridor or where a facility for more than one alternative mode of transportation
may be involved, and (2) projects where feasible alternatives are limited to the existing
corridor but did not qualify to pass directly to the design phase. The main difference
between the two as far as processing is concerned is that the first group has not yet
narrowed its alternatives down to feasible alternatives.