1) Produce Drawings demonstrating the real impact to both views and sunsets.
2) Generate accurate diagrams showing the effect on natural airflow and wind
both at micro and macro level on the “green” design of corridors at WaterMark.
3) Define the energy costs required to compensate for this loss of airflow, as it maybe
necessary to enclose and air condition all corridors in Tower B and perhaps Tower
A.
4) Provide drawings demonstrating the impact of sunlight being blocked.
5) Demonstrate the effect of Casa Condo’s multi-storey car park lighting on
WaterMark residents at night.
6) Document the significant quantities of additional dust that will be created by the airflow disturbance of Casa Condo both during construction and once completed.
7) Complete drawings to show the effect on WaterMark resident’s privacy.
8) Define all setback distances form Watermark, the klong, the river and the main
road.
9) Indicate the effects of noise pollution on WaterMark residents.
10) Draw and define the impact of Casa Condo’s construction on the klong and
drainage in the area.
11) Challenge the developer’s to demonstrate how they intend to keep WaterMark Residents and their construction personnel safe form the effects of the cancer causing asbestos believed to be on the site as a result of the demolition of the ice factory.