The analysis of the data collected from the
questionnaires showed that the work size which had
been re-executed because of faults in the project's
requirements such as; contract conditions, design,
specifications …etc. was huge. The reason of these
faults is the absence of an integrated monitoring
system through which these faults can be prevented
as early as possible