Pete Laidler, of the Structure Workshop, explains that "the structural strategy was to create a timber beam and post module that could be repeated around the perimeter of the theatre with full plan and elevation bracing. This module was adapted to turn the corners and span the goal openings without visibly altering the architectural rhythm. Owing to a tight construction budget the frame had to be easy to erect using a single spider crane and priority was given to simple details with minimum fixings that could accommodate construction tolerances.