connected to a 2 HP Jacuzzi pump with PVC pipe (5.16 cm diameter). During the study of the control pond, 30% of the water was exchanged every third day and 60% every two weeks to adjust for the physicochemical variables in the water, such as concentration of ammonia. In treatments R2, R3, and R4, water was added only to maintain the water level after losses from evaporation.