9.0 General Terms and Conditions at Robert BOSCH Scope:
If required, Interpreter for Language in English for proper communication.
Additional Man hours required, if any, apart from the above mentioned offered shall be extra on per day basis.
Unloading of the equipment from Truck & Keeping at the desired location on the site.
Material handling equipment required for Loading & Un-Loading of component, during Installation & Commissioning of the equipment at site.
Providing Utilities i.e. Compressed filtered dry air (6 Bar pressure), Electricity supply 240VAC till the machine.
Support of Customer’s Maintenance Team during the Installation & Commissioning of equipment at site.
Component for trials at site shall be provided free of cost.
BOSCH to ensure the continuous supply of Power & Compressed filtered Air without stopping during the installation and commissioning.
Spares & Consumables required for the machine (required if any). TOX® shall provide on demand the lists of recommended spares to be kept as spares for trouble free operation and it will be charged extra.
Racks & Plastic bin for keeping the Material, other than mentioned in the offer.