7.6 The Planning Authority , within development control process may permit- according to what is stated in paragraph 7.4, the construction and the operation of a small hotel establishment (up to 100 rooms) within the area of Central Operations/Services, according to the provisions of the The Hotels and Tourist Establishments Laws, provided that the operation of the hotel establishment is sufficiently justified in the Feasibility study and its construction will only take place after the construction and operation of the low impact (light industrial) production units of high-tech products.
8. Basic Infrastructure
8.1. The successful tenderer has the obligation to construct all the basic infrastructure within the Park such as water supply system, electricity supply system, drainage system, telecommunications, and possibly,- following consultation with the competent authority- a tertiary waste water treatment plant. The electricity supply and telecommunications networks should be laid underground.
8.2. The development should provide the necessary road network to serve its needs and the successful tenderer will be obliged to take all necessary actions for the construction of the road network, pedestrian roads, cycle paths, etc. within the boundaries of the Park and be liable for all expenses for its construction, care and maintenance.
8.3. Sufficient parking spaces will be provided for all development (public and private). The construction of underground parking spaces will be encouraged so that green areas are not affected. In case, overground parking places are constructed for the purposes of the technological businesses units, their area will only be included in the calculation of the plot coverage ratio not in the building ratio.
8.4. The use of public roads or public pedestrian areas shall not be obstructed in any way either for purposes of access, or due to the development of private properties, or due to the provision of necessary infrastructure of public or private networks, provided all necessary permits and authorizations have been obtained.
8.5. It is made clear that regardless of the works required at each stage of the development, all infrastructure works will be constructed at the initial stage.
9. Environmental Parameters
The basic requirements for the siting and development of the above mentioned uses concern the following:
9.1. The new development shall be integrated in the micro-environment of the area, and adapted to the natural terrain of the area, so as to restrict any alteration of the topography by means of excavation, infilling and retaining walls and to safeguard sightlines towards the sea and other important features (stepped building form). Constructions on pilots