The minimum loading condition was intentionally selected in Section 2.1 as the point in the year when total electric system load was at a minimum. The rationale for this selection is essentially the idea that if the existing electric generation infrastructure can meet the minimum loading condition once, then it can ostensibly do it again to accommodate the presence of wind energy on the system.