Two scenarios were chosen to define the limits of net generation in the feeder regarding voltage rise. The first scenario investigates the network with a 60 MVA equivalent load, representing the adjacent feeders being connected to the substation. Results of this scenario are presented in fig.6 and 7. For net generation levels below 1.93 kW per hour, the voltage was within CAN3-C235 limits for normal operation. The voltage rise rate ( slope of the voltage trend measured in the graphic) found at the last customer was 0.60%/kW/house.