Steady stage
After reservoir has been full for some time, condition of steady seepage become established through the dame with the soil below the top flow line in the fully saturated stated.
This condition must be analyzed in term of effective stress with values of pore pressure being determined from the flow net.
The factor of safety must be at least 1.5