Hammer mill throughput (W) was determined experimentally by measuring the time required for grinding the test samples and the sample mass. A platform scale (Axis B15) was used to measure the mass of granulated material. The grinding time of the samples was presented in a graph representing the torque as a function of grinding time. The start and end of the grinding process were determined from the torque curve. The starting (tp) and ending (tk) times of the grinding process were determined by the program for the indicated points on the time axis (tr). Hammer mill throughput while grinding the test samples was calculated using equation 6. The arithmetic mean of hammer mill throughput, which takes into account the number of repetitions, was calculated using equation 8: