We have a plan to make a release on G-BOM about Cover F/Neck on this week.
D/Note# is HF0817. This release includes the other design change.
- Correct dimension for Cond Tank
- Correct surface treatment and add tolerance for Rad MTG Sleeve
- PL change for Rad Pipe
- Add tolerance and change tolerance for Sleeve
- Label change for customer’s request
- Specification change for Rad (Water Pressure drop)
- Connector screw depth change for Cond
- Specification change for Cond (Air Pressure drop)