According to the top pitch needs doing roller. it appears that the expert hired to maintain the top pitch has recommended against grinding the field because it would lead to soil compaction and poor drainage. which means that grinding it could worsen the drainage issues and cause water pooling during rain. This would require additional coring and incur significant expenses for equipment.