Plastic part white
After insertion of the part (rake at track 1) and actuation of the Richten-button, the piston rod of the shunt is moving to its working position (to S0.6). If this position (S0.6) is reached, the belt is moving forward, until the capacities sensor of track 2 (S0.8) is actuating. The actuation of this sensor is also the signal for the piston rod of the shunt for returning to its normal position (at S0.5). Reching of normal position is -end of cycle of plastic part white.