Tests up to 20 consecutive CV cycles were also carried out in 0.1 M sodium hydroxide (pH 13) and in limewater with 0.063 M sodium hydroxide (pH 12.8) to evaluate the peak formation and modification. The presence of localised corrosion was also confirmed by optical microscopy.