As per below, Yang Ming insist we pay S$117.00 for the damage in which, we did not do.
Below pictures showed, container was dismount on ground and cargoes loaded with forklift where the tracks show. The cargoes plus the forklift may incur an overweight on the floorboard, as it is wooden plank. On our side, we used a pallet jack and ropes to pull out the pallets. Hence, the floorboard will not be overweight. We even washed the floorboard, scrub the wall/roof off scotch tapes, But yet the want to charge us with “chemical washing”.
In view of these, hope load port or Summit will settle this damage claims so we can move on.