Referring to GMTh/BSC team supplier improvement plan / Cost reduction for Y2014.
We’d like to appoint to conduct Elimination of the 7 Forms of Waste (COMMWIP) activity Does the supplier have a system in place to ensure products that do not comform to specified requirements are prevented from unintended use?
= > Must be revise Flow to specified responsible section ( now only production) Recommendation strengthening, stretching, and action
Repeat Steps 3-5 for the next problem