Attached pls. find the PRM presentation and financial results of Apr.14 for your information.
• WH & TP cost of Apr.14 was 0.49 MB and below plan 0.08 MB or 15% of plan
• Piece dispatched of this month was 65% above plan
• WH Cost per piece was 1.42 Baht and below plan