We have inspected the loss location and discussed matters with the Insured and the employees of ExxonMobil Limited on Monday 8th June 2015. The Insured advised us that when the rainwater collects in the deck of 12th floor a large amount of water was flowing inside the office areas 12th floor and the water flowing to 11th – 10th floor. The water could to travel from the upper floor to the lower floor because the water was flow to gravity and above ceiling.