Where there are 2 or more parts made in the same manufacturing process, an allocation of less than 100% per part is required in this row (F).
For shared processes, Allocation % includes changeover time into this part number
Where allocation is less than 100% (2 or more parts per process), a Shared Loading Plan must be completed.