- RC-400 Recoat (TRC)
o I highlighted to TRC that our new approach is to follow Work Packs (WPs)/ Procedures/ and JSEAs. Consultant’s CS & SHE Officer will issue NCR/QI/SNCR or stop the work for any deviation.
o Contractor shall develop “Violation Matrix” based on the document that was prepared and proposed by Khun Rachit. Khun Veerapong suggested that this Matrix shall be available as one of the requirements to close NCR No. 008. Matrix shall be prepared by TRC and signed by PTT & TET.
o It was highlighted to TRC that we cannot increase number of coating inspectors. They shall reduce their repair rate.
o All NCRs and Qis shall be issued to TRC with TN.